Wood Plank Road, a section of a landscape

  • Before construction plank of outdoor composite decking to do the testing. Surveying staff through the general layout and description of the study design, understand the overall project layout, engineering characteristics of the surrounding environment, the location and the coordinates of the building, followed by the understanding of the relationship between the location and elevation coordinate with field measurements of the building, the standard points.

    Measuring group founded by bathroom tiles ideasoutdoor composite deckingprofessional surveyors project department, according to the given point and elevation control point coordinates engineering position, establish axis control network. Inspection and acceptance procedures required for all personnel Surveying group tests, detailed drawings and plans correspondent, clear division of labor, the progress of all the work Surveying and daily schedule, according to the head of the overall project schedule arrangements.

    Surveying staff through the general layout and description of the study designbalcony floor tile sizes, understand the overall project layout, engineering characteristics of the surrounding environment, the location and the coordinates of the building, followed by the understanding of the relationship between the location and elevation coordinate with field measurements of the building, the standard points.