The Construction Waste Crusher has a large crushing ratio, high efficiency, low energy consumption, and uniform product particle size, which is suitable for medium and fine crushing of various ore and rocks. Let us take a look at the small issues that need attention during the installation of the cone crusher. 1, Main frame ldquo; U rdquo; type seal The 'U' type seal on the main frame needs to be determined at the correct position. Before the glue is applied, the seal should be tested to ensure its correct position and do not force the seal into the groove. 2, release cylinder During installation, the lever of the release cylinder must be pulled out the correct distance to avoid the piston hitting the bottom of the cylinder. 3, leave the axial oil gap Heating the oil sling ring to a temperature of 27 degrees Celsius higher than the ambient temperature, put on leather gloves and push it onto the horizontal axis, and set the feeler gauge to a suitable thickness to set the axial oil gap. When the oil ring is cooled, remove the feeler gauge and carefully install the oil ring seat and lip seal. Be sure not to disturb the axial oil gap that has been left. 4.Direct drive The alignment of the coupling is very important, and the two couplings should not be in contact during operation. In the direct connection mode, the position of the copper sleeve oil tank is always directly below the outer copper sleeve, and the inner copper sleeve is directly above the position. 5.Installation of eccentric sleeve The eccentric sleeve needs to be lifted with the eccentric sleeve, and the two ring bolts are screwed into the thick and thin sides of the eccentric sleeve. Before disassembling the eccentric sleeve assembly, the spherical tile must be removed first. 6.Mounting cone installation The ring bolt must be on the same side as the thick side of the eccentric sleeve, and the high side of the moving cone corresponds to the thick side of the eccentric sleeve.
The Construction Waste Crusher has a large crushing ratio, high efficiency, low energy consumption, and uniform product particle size, which is suitable for medium and fine crushing of various ore and rocks. Let us take a look at the small issues that need attention during the installation of the cone crusher. 1, Main frame ldquo; U rdquo; type seal The 'U' type seal on the main frame needs to be determined at the correct position. Before the glue is applied, the seal should be tested to ensure its correct position and do not force the seal into the groove. 2, release cylinder During installation, the lever of the release cylinder must be pulled out the correct distance to avoid the piston hitting the bottom of the cylinder. 3, leave the axial oil gap Heating the oil sling ring to a temperature of 27 degrees Celsius higher than the ambient temperature, put on leather gloves and push it onto the horizontal axis, and set the feeler gauge to a suitable thickness to set the axial oil gap. When the oil ring is cooled, remove the feeler gauge and carefully install the oil ring seat and lip seal. Be sure not to disturb the axial oil gap that has been left. 4.Direct drive The alignment of the coupling is very important, and the two couplings should not be in contact during operation. In the direct connection mode, the position of the copper sleeve oil tank is always directly below the outer copper sleeve, and the inner copper sleeve is directly above the position. 5.Installation of eccentric sleeve The eccentric sleeve needs to be lifted with the eccentric sleeve, and the two ring bolts are screwed into the thick and thin sides of the eccentric sleeve. Before disassembling the eccentric sleeve assembly, the spherical tile must be removed first. 6.Mounting cone installation The ring bolt must be on the same side as the thick side of the eccentric sleeve, and the high side of the moving cone corresponds to the thick side of the eccentric sleeve.